Throughput and product flow

Know the throughput before fixing the design.

Throughput, cycle time and buffers in a digital machine model.

Compare concepts, locate bottlenecks and test changes to new or existing production equipment. Use the findings to make informed decisions about throughput, cycle time and product flow.

What limits throughput?

Example capacity calculation for three stations in series. One product per cycle, excluding stops, changeovers and buffer constraints.

  1. Station A

    120 units/hour

  2. Station BBottleneck

    90 units/hour

  3. Station C

    110 units/hour

Theoretical maximum throughput90 units/hour

Before the price is fixed

Can the concept deliver the throughput you promise?

See how stations, buffers and movements affect throughput before the design is fixed.

  1. Infeed
  2. Buffer
  3. Bottleneck
  4. Outfeed

Product flow, cycle time and buffers

You can see whether the promised output can be reached before the steel is ordered.

Where the bottleneck sits

You can see which station is holding back the cycle time, and where the queue builds up.

A video the customer can follow

Sales can show the product flow in the way the end customer usually needs to understand it.

The same model carried into code and test

The model can be adapted for PLC, motion and HMI testing and later used for virtual commissioning.

One model across the machine lifecycle
  1. 1Quote and throughput
  2. 2Development
  3. 3Virtual FAT
  4. 4Startup and SAT
  5. 5Service and training
  6. 6Sales and video

From concept to commissioning

Example project sequence.

  1. 01

    Input

    The concept, the count you want to promise, cycle time, buffers and the choices that are not locked yet.

  2. 02

    Simulation

    Unity runs the product flow. You see where the queue grows, and whether the volume is reachable, before the steel is ordered.

  3. 03

    Output

    An answer you can price, and a video the end customer can watch. Later, the same model can be connected to the PLC code.

Unity simulation of pallets and product flow on roller conveyors
Product flow in a Unity simulation.

Machines in motion

Explore neexo’s own animation of a digital machine environment.

Explore animation and simulation

What you receive

  • A judgement of whether count and cycle time are reachable
  • Where the buffer and the bottleneck sit in the concept
  • A short video the end customer can understand
  • A model that can be carried into PLC-connected virtual commissioning

The path on to virtual commissioning

When PLC, motion and HMI are developed, the model can be reused for virtual test scenarios. Physical FAT and safety validation remain on the actual machine.

Virtual commissioning

Reuse the model from quotation to testing.

The concept

We put flow, stations and motion into Unity and run the volume you need to promise.

The code

PLC, motion and HMI can be tested against the same model, instead of waiting for the assembled machine.

Startup

The model can be used for virtual commissioning before FAT. That is a later step, not a condition for starting.

Read about throughput before the PLC code

Common questions

Do we need a finished machine before you can simulate?

No. The quote phase is exactly where the machine does not exist yet. We work from the concept, the cycle time and the choices you are about to promise.

Is this the same as virtual commissioning?

No. Here we test whether the concept can reach the throughput. Virtual commissioning comes later, when the code has to run against the model before FAT.

What should we send?

A sketch, a target cycle time or a short description is enough to say whether a simulation is worth doing.

Can your machine meet its throughput target?

Send a sketch, a target cycle time or a short description. We clarify what needs investigating and how to obtain a useful result.